CSS MenuMaker

News and Pictures

2001 - Part 2

September

The framwork on the forward panels, side walls and the glareshield. Everything has been designed to be removed for servicing.
All the side wall framework is complete and is to be sheeted along with the rudder pedal wells.
The main frame of the library has been installed.

The windows are now installed and include a black shadow line around each window.

October

Installation of the side wall panels.

Installation of the Aircraft Library and the control columns.

Final construction of the foward panel mounting frame.

Installation for the CDU's and final interface testing.

What more is there to say. It is together for the time being.