News and Pictures from 2004

03/05/04

The motion has been moved in to place for testing and setup under the mezzanine.

The Hydraulic Pump was also moved into position.

We will need to connect the three phase power to the pump and also test and connect the hydraulic lines.

It will take the next 9 months to run up and test the motion and pump.

Once this is done, we will need to start work on the interface between the simulator and the platform.