Motion System

Part 2 - Installation

 

Construction begins again

In May 2006, the motion base was turned around and a frame attached to check the limits of the sim.
Once it was established that the sim would fit on the platform, it was bolted the the floor using chemical bolts.

 

Testing Begins

With the platform bolted to the motion base and the base bolted to the follow, it was time to being further testing.
The first step was to check that the Sim did not hit the floor during extreme movements.
The result was that the Sim is clear of the floor by a matter of inches!

Below are two short videos of the Simulator in action.
(Each Video 700K)